Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
168
matching recommendationsNAICS | 331512 | Steel Investment Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0127 # 06 Y:2023 | 06 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $9,906 | $19,900 | n/a |
CW0127 # 05 Y:2023 | 05 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $10,872 | $33,000 | n/a |
CW0127 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,943 | $21,648 | n/a |
CW0127 # 03 Y:2023 | 03 | 2023 | RECYCLE CASTING SAND | $414,227 | $38,394 | n/a |
CW0127 # 02 Y:2023 | 02 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $16,199 | $33,933 | n/a |
CW0127 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,576 | $56,000 | n/a |
WM0180 # 05 Y:2022 | 05 | 2022 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,714 | $0 | Not Implemented |
WM0180 # 12 Y:2022 | 12 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $555 | $1,060 | Not Implemented |
WM0180 # 11 Y:2022 | 11 | 2022 | INSTALL OCCUPANCY SENSORS | $761 | $1,050 | Not Implemented |
WM0180 # 09 Y:2022 | 09 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,067 | $4,100 | Not Implemented |
WM0180 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,957 | $3,100 | Implemented |
WM0180 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,388 | $0 | Not Implemented |
WM0180 # 04 Y:2022 | 04 | 2022 | USE SYNTHETIC LUBRICANT | $2,843 | $4,510 | Implemented |
WM0180 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,178 | $11,084 | Not Implemented |
WM0180 # 07 Y:2022 | 07 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,006 | $0 | Implemented |
WM0180 # 03 Y:2022 | 03 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,931 | $8,560 | Implemented |
WM0180 # 08 Y:2022 | 08 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,804 | $0 | Implemented |
WM0180 # 10 Y:2022 | 10 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $771 | $2,000 | Implemented |
AM0801 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,735 | $9,030 | Implemented |
AM0801 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,875 | $2,660 | Implemented |
AM0801 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $1,150 | $420 | Not Implemented |
AM0801 # 06 Y:2020 | 06 | 2020 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $580 | $300 | Implemented |
AM0801 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,240 | $1,265 | Not Implemented |
AM0801 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,690 | $1,000 | Implemented |
AM0731 # 07 Y:2017 | 07 | 2017 | USE SYNTHETIC LUBRICANT | $400 | $0 | Not Implemented |