Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
180
matching recommendationsNAICS | 331512 | Steel Investment Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0603 # 06 Y:2025 | 06 | 2025 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,156 | $949 | n/a |
AS0603 # 05 Y:2025 | 05 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,172 | $545 | n/a |
AS0603 # 04 Y:2025 | 04 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $18,772 | $291 | n/a |
AS0603 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $172,434 | $1,040,663 | n/a |
AS0603 # 02 Y:2025 | 02 | 2025 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $279,654 | $313,240 | n/a |
AS0603 # 07 Y:2025 | 07 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $478 | $246 | n/a |
AS0603 # 01 Y:2025 | 01 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $320,000 | $104,670 | n/a |
WM0237 # 02 Y:2025 | 02 | 2025 | REPLACE BOILER | $6,383 | $56,908 | n/a |
WM0237 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,999 | $0 | n/a |
WM0237 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,168 | $1,487 | n/a |
WM0237 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $894 | $349 | n/a |
WM0237 # 01 Y:2025 | 01 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,320 | $3,350 | n/a |
CW0127 # 05 Y:2023 | 05 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $10,872 | $33,000 | n/a |
CW0127 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,943 | $21,648 | n/a |
CW0127 # 06 Y:2023 | 06 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $9,906 | $19,900 | n/a |
CW0127 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,576 | $56,000 | n/a |
CW0127 # 03 Y:2023 | 03 | 2023 | RECYCLE CASTING SAND | $414,227 | $38,394 | n/a |
CW0127 # 02 Y:2023 | 02 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $16,199 | $33,933 | n/a |
WM0180 # 07 Y:2022 | 07 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,006 | $0 | Implemented |
WM0180 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,388 | $0 | Not Implemented |
WM0180 # 05 Y:2022 | 05 | 2022 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,714 | $0 | Not Implemented |
WM0180 # 04 Y:2022 | 04 | 2022 | USE SYNTHETIC LUBRICANT | $2,843 | $4,510 | Implemented |
WM0180 # 10 Y:2022 | 10 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $771 | $2,000 | Implemented |
WM0180 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,957 | $3,100 | Implemented |
WM0180 # 12 Y:2022 | 12 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $555 | $1,060 | Not Implemented |