Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 33152 | Nonferrous Metal Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0319 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $687 | $800 | Implemented |
MZ0319 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,762 | $4,140 | Implemented |
MZ0319 # 05 Y:2021 | 05 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,286 | $480 | Implemented |
MZ0319 # 06 Y:2021 | 06 | 2021 | INSTALL SPECTRAL REFLECTORS / DELAMP | $13,167 | $45,756 | Implemented |
MZ0319 # 02 Y:2021 | 02 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,278 | $240 | Implemented |
MZ0319 # 03 Y:2021 | 03 | 2021 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $3,002 | $600 | Implemented |
MZ0319 # 08 Y:2021 | 08 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,401 | $25,720 | Implemented |
MZ0254 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $384 | $1,000 | Implemented |
MZ0254 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,434 | $10,000 | Implemented |
MZ0254 # 02 Y:2018 | 02 | 2018 | USE OPTIMUM THICKNESS INSULATION | $49,702 | $20,960 | Implemented |
MZ0254 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,653 | $180 | Implemented |
MZ0254 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,370 | $57,615 | Implemented |
MZ0254 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,856 | $10,840 | Implemented |
MZ0254 # 05 Y:2018 | 05 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,499 | $52,000 | Implemented |
MZ0193 # 01 Y:2015 | 01 | 2015 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $21,804 | $700 | Implemented |
MZ0193 # 02 Y:2015 | 02 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,714 | $1,160 | Implemented |
MZ0193 # 03 Y:2015 | 03 | 2015 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $62,777 | $37,500 | Implemented |
MZ0152 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,003 | $9,000 | Implemented |
MZ0152 # 02 Y:2014 | 02 | 2014 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $833 | $690 | Implemented |
MZ0152 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $14,092 | $1,160 | Implemented |
MZ0110 # 01 Y:2013 | 01 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,869 | $3,480 | Implemented |
MZ0110 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,761 | $39,840 | Implemented |
MZ0110 # 03 Y:2013 | 03 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $90,000 | $97,500 | Implemented |
MZ0110 # 06 Y:2013 | 06 | 2013 | USE COMPRESSOR AIR FILTERS | $4,048 | $2,400 | Implemented |
MZ0095 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,134 | $5,290 | Implemented |