Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 331524 | Aluminum Foundries (except Die-Casting) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0349 # 12 Y:2006 | 12 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $375 | $200 | Implemented |
WV0349 # 11 Y:2006 | 11 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $1,998 | $512 | Implemented |
WV0349 # 09 Y:2006 | 09 | 2006 | INSULATE BARE EQUIPMENT | $3,740 | $1,318 | Implemented |
WV0349 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,291 | $1,000 | Implemented |
WV0349 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,242 | $400 | Implemented |
WV0349 # 04 Y:2006 | 04 | 2006 | REDUCE VENTILATION AIR | $13,672 | $10,295 | Implemented |
WV0349 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,527 | $640 | Implemented |
WV0349 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $48,286 | $39,350 | Implemented |
UD0696 # 04 Y:2004 | 04 | 2004 | ELIMINATE/REDUCE AN OPERATION | $9,375 | $0 | Implemented |
UD0696 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,891 | $600 | Implemented |
UD0696 # 08 Y:2004 | 08 | 2004 | IMPROVE COMBUSTION CONTROL CAPABILITY | $1,617 | $0 | Implemented |
UD0696 # 10 Y:2004 | 10 | 2004 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $845 | $0 | Implemented |
UD0696 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $631 | $486 | Implemented |
WV0266 # 08 Y:2003 | 08 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,937 | $79 | Implemented |
WV0266 # 14 Y:2003 | 14 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $39,573 | $0 | Implemented |
WV0266 # 12 Y:2003 | 12 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,000 | $2,550 | Implemented |
WV0266 # 10 Y:2003 | 10 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,326 | $0 | Implemented |
WV0266 # 09 Y:2003 | 09 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,520 | $150 | Implemented |
WV0266 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $9,430 | $625 | Implemented |
WV0266 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,846 | $250 | Implemented |
WV0266 # 02 Y:2003 | 02 | 2003 | INSULATE BARE EQUIPMENT | $22,125 | $1,423 | Implemented |
UD0665 # 05 Y:2003 | 05 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,325 | $0 | Implemented |
UD0665 # 10 Y:2003 | 10 | 2003 | COVER OPEN TANKS | $256 | $400 | Implemented |
UD0665 # 09 Y:2003 | 09 | 2003 | DISCONNECT BALLASTS | $790 | $45 | Implemented |
UD0665 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,561 | $8,112 | Implemented |