IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

393

matching recommendations
Reset
NAICS 331524 Aluminum Foundries (except Die-Casting)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0087 # 01 Y:2012 01 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,109 $8,488 Not Implemented
MZ0087 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,564 $0 Not Implemented
MZ0087 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,921 $27,100 Not Implemented
MZ0087 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $263 $190 Not Implemented
MZ0087 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $41,961 $100,000 Not Implemented
MZ0087 # 06 Y:2012 06 2012 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,430 $3,000 Not Implemented
MZ0087 # 07 Y:2012 07 2012 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $991 $0 Not Implemented
MZ0081 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,034 $860 Implemented
MZ0081 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $4,444 $4,000 Implemented
MZ0081 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $9,628 $8,667 Implemented
MZ0081 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $11,110 $9,100 Implemented
MZ0081 # 05 Y:2012 05 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $58,850 $120,000 Implemented
MZ0081 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,137 $1,700 Implemented
MZ0081 # 07 Y:2012 07 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $0 $0 Implemented
SU0298 # 01 Y:2010 01 2010 PAY BILLS ON TIME TO AVOID LATE FEES $21,457 $0 Not Implemented
SU0298 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,096 $0 Not Implemented
SU0298 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,218 $1,248 Not Implemented
SU0298 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $431 $86 Not Implemented
SU0298 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $792 $266 Not Implemented
SU0298 # 06 Y:2010 06 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $125 $274 Not Implemented
SU0298 # 07 Y:2010 07 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,873 $81,798 Not Implemented
SU0298 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,123 $45,613 Not Implemented
SU0298 # 09 Y:2010 09 2010 OPTIMIZE PLANT POWER FACTOR $4,349 $17,933 Not Implemented
BD0381 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,618 $24,140 Not Implemented
BD0381 # 02 Y:2010 02 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24,197 $70,000 Implemented