Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,610
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0131 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,001 | $40,224 | Implemented |
MI0131 # 02 Y:2006 | 02 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $41,642 | $6,538 | Implemented |
MI0131 # 03 Y:2006 | 03 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $16,391 | $29,320 | Implemented |
MI0131 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,321 | $1,074 | Implemented |
MI0131 # 05 Y:2006 | 05 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,701 | $180 | Implemented |
MI0131 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $5,552 | $216 | Implemented |
MI0131 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,332 | $0 | Implemented |
MI0131 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,254 | $30 | Implemented |
BD0314 # 03 Y:2006 | 03 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $491 | $1,250 | Implemented |
UM0301 # 02 Y:2006 | 02 | 2006 | INSULATE BARE EQUIPMENT | $6,754 | $1,971 | Implemented |
UM0301 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,457 | $375 | Implemented |
UM0301 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,325 | $0 | Implemented |
UM0300 # 01 Y:2006 | 01 | 2006 | INSULATE BARE EQUIPMENT | $15,780 | $14,167 | Implemented |
UM0300 # 02 Y:2006 | 02 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,203 | $2,500 | Implemented |
UM0300 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,520 | $515 | Implemented |
UM0300 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,993 | $500 | Implemented |
UM0300 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $972 | $560 | Implemented |
UM0300 # 06 Y:2006 | 06 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $696 | $825 | Implemented |
UM0300 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $537 | $1,000 | Implemented |
UM0300 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $75 | Implemented |
SU0235 # 01 Y:2006 | 01 | 2006 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,295 | $0 | Implemented |
SU0235 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,954 | $0 | Implemented |
SU0235 # 03 Y:2006 | 03 | 2006 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $255 | $0 | Implemented |
SU0235 # 04 Y:2006 | 04 | 2006 | USE SYNTHETIC LUBRICANT | $247 | $0 | Implemented |
SU0235 # 05 Y:2006 | 05 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $14,219 | $1,527 | Implemented |