IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,490

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0275 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,106 $6,980 Implemented
BD0275 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,119 $6,000 Implemented
BD0275 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $391 $360 Implemented
BD0275 # 10 Y:2005 10 2005 INSTALL EQUIPMENT TO MOVE PRODUCT $262,080 $80,000 Implemented
BD0275 # 11 Y:2005 11 2005 INSTALL AUTOMATIC PACKING EQUIPMENT $121,680 $500,000 Implemented
BD0275 # 12 Y:2005 12 2005 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $67,500 $2,580 Implemented
BD0276 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,544 $48,000 Implemented
LM0087 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,069 $17,418 Implemented
LM0087 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,466 $760 Implemented
LM0087 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $244 $377 Implemented
LM0087 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,321 $1,000 Implemented
LM0087 # 08 Y:2005 08 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $19,500 $3,680 Implemented
MS0265 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,775 $59,467 Implemented
MS0265 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,680 $189 Implemented
MS0264 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,471 $84,783 Implemented
MS0264 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,737 $318 Implemented
SD0354 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,424 $320 Implemented
SD0354 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,367 $18,600 Implemented
SD0354 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,079 $398 Implemented
TA0089 # 01 Y:2004 01 2004 MOVE BOILER TO MORE EFFICIENT LOCATION $87,420 $4,860 Implemented
TA0089 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,060 $540 Implemented
TA0089 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $10,000 $3,200 Implemented
TA0089 # 04 Y:2004 04 2004 USE MINIMUM SAFE OVEN VENTILATION $1,890 $1,500 Implemented
TA0089 # 05 Y:2004 05 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,740 $0 Implemented
IC0090 # 01 Y:2004 01 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,317 $0 Implemented