IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,649

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0451 # 05 Y:2004 05 2004 REUSE RAGS UNTIL COMPLETELY SOILED $1,790 $1,910 Implemented
AM0451 # 08 Y:2004 08 2004 PAY BILLS ON TIME TO AVOID LATE FEES $200 $0 Implemented
LL0179 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,033 $2,120 Implemented
LL0179 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $15 Implemented
LL0179 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $372 $245 Implemented
LL0179 # 08 Y:2004 08 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $313 $230 Implemented
LL0179 # 09 Y:2004 09 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $726 $629 Implemented
WI0458 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,180 $17,325 Implemented
WI0458 # 02 Y:2004 02 2004 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,420 $18,000 Implemented
WI0458 # 03 Y:2004 03 2004 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $4,400 $3,500 Implemented
WI0458 # 04 Y:2004 04 2004 INSTALL TIMERS AND/OR THERMOSTATS $3,959 $7,900 Implemented
LM0067 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $418 $165 Implemented
LM0067 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,055 $0 Implemented
LM0067 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,647 $2,176 Implemented
LM0067 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $272 $247 Implemented
LM0067 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $114 $50 Implemented
LM0067 # 07 Y:2004 07 2004 MODIFY WORKLOAD $45,760 $570 Implemented
LM0067 # 08 Y:2004 08 2004 MODIFY WORKLOAD $10,652 $5,500 Implemented
LM0067 # 09 Y:2004 09 2004 MODIFY WORKLOAD $81,000 $9,400 Implemented
AM0448 # 01 Y:2003 01 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,266,100 $805,000 Implemented
AM0448 # 02 Y:2003 02 2003 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $24,300 $5,730 Implemented
AM0448 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,000 $2,000 Implemented
AM0448 # 05 Y:2003 05 2003 USE SYNTHETIC LUBRICANT $4,032 $0 Implemented
AM0448 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $2,200 $2,000 Implemented
AM0448 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,120 $25 Implemented