IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,490

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0244 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $58,749 $17,550 Implemented
IP0095 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,935 $25 Implemented
IP0095 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,023 $2,041 Implemented
IP0095 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,255 $11,125 Implemented
IP0095 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,356 $3,070 Implemented
IP0095 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $2,961 $1,093 Implemented
IP0095 # 10 Y:2018 10 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,136 $3,970 Implemented
OR0697 # 01 Y:2018 01 2018 USE MAGNETIC TECHNOLOGY TO TREAT WATER $201,762 $50,000 Implemented
OR0697 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $25,653 $51,599 Implemented
OR0697 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,725 $250 Implemented
WM0116 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,895 $14,722 Implemented
WM0116 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,729 $1,833 Implemented
WM0116 # 07 Y:2018 07 2018 REPAIR OR REPLACE STEAM TRAPS $1,678 $3,960 Implemented
WM0116 # 08 Y:2018 08 2018 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,597 $3,400 Implemented
WM0116 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $395 $720 Implemented
NL0016 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,400 $160,000 Implemented
NL0016 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,700 $15,500 Implemented
UA0186 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $1,872 $740 Implemented
UA0186 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,615 $4,645 Implemented
UA0186 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,297 $60 Implemented
AM0741 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,260 $500 Implemented
AM0741 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,210 $10 Implemented
AM0741 # 04 Y:2017 04 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $560 $160 Implemented
IP0093 # 01 Y:2017 01 2017 PAY BILLS ON TIME TO AVOID LATE FEES $4,308 $0 Implemented
IP0093 # 02 Y:2017 02 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,245 $0 Implemented