IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

436

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0521 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,237 $11,000 Not Implemented
LE0521 # 08 Y:2022 08 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $27,881 $128,814 Implemented
UD1035 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,050 $0 Implemented
UD1035 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $128 $0 Implemented
UD1035 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,591 $604 Not Implemented
UD1035 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,603 $6,300 Not Implemented
UD1035 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,106 $5,256 Implemented
UD1035 # 06 Y:2022 06 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $150 $50 Not Implemented
UD1035 # 07 Y:2022 07 2022 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $10,297 $12,000 Not Implemented
TT0269 # 01 Y:2022 01 2022 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $24,682 $2,000 Not Implemented
TT0269 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,069 $25,000 Not Implemented
TT0269 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,223 $27,500 Not Implemented
TT0269 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,847 $3,500 Not Implemented
TT0269 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,648 $2,500 Not Implemented
TT0269 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,911 $11,000 Not Implemented
MI0403 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $15,827 $43,707 Implemented
MI0403 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $11,648 $5,536 Implemented
MI0403 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,718 $2,020 Implemented
MI0403 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,275 $5,780 Implemented
MI0403 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,149 $40 Implemented
MI0403 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,656 $480 Not Implemented
MI0403 # 07 Y:2022 07 2022 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,171 $99 Implemented
UL2202 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $23,158 $0 Implemented
UL2202 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,861 $12,941 Implemented
UL2202 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,677 $0 Implemented