IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0531 # 07 Y:2016 07 2016 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $2,730 $2,795 Not Implemented
WV0531 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,225 $4,010 Implemented
WV0531 # 09 Y:2016 09 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $956 $1,000 Implemented
WV0531 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $256 $649 Implemented
WM0091 # 01 Y:2016 01 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $12,568 $2,860 Not Implemented
WM0091 # 02 Y:2016 02 2016 COMBINE UTILITY METERS $8,777 $30,000 Not Implemented
WM0091 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,746 $1,275 Not Implemented
WM0091 # 04 Y:2016 04 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,722 $0 Not Implemented
WM0091 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,051 $230 Implemented
WM0091 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,795 $1,501 Not Implemented
WM0091 # 07 Y:2016 07 2016 USE PHOTOCELL CONTROLS $1,383 $560 Not Implemented
OK0948 # 01 Y:2016 01 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,142 $29,000 Not Implemented
OK0948 # 02 Y:2016 02 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,510 $2,320 Implemented
OK0948 # 03 Y:2016 03 2016 USE PHOTOCELL CONTROLS $862 $3,870 Not Implemented
OK0948 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,857 $18,014 Not Implemented
OK0948 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,007 $926 Not Implemented
OK0948 # 06 Y:2016 06 2016 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $27,228 $83,600 Implemented
OK0948 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,797 $118,583 Not Implemented
OK0948 # 08 Y:2016 08 2016 USE OPTIMUM THICKNESS INSULATION $382 $1,310 Implemented
OK0948 # 09 Y:2016 09 2016 USE OPTIMUM THICKNESS INSULATION $58 $203 Implemented
OK0948 # 10 Y:2016 10 2016 USE POWER DURING OFF-PEAK PERIODS $12,184 $0 Not Implemented
OK0948 # 11 Y:2016 11 2016 OPTIMIZE PLANT POWER FACTOR $7,251 $25,830 Implemented
BS0083 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $821 $196 Not Implemented
BS0083 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,699 $982 Not Implemented
BS0083 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,462 $3,018 Not Implemented