IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0090 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,518 $13,900 Not Implemented
UA0090 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $6,230 $4,203 Not Implemented
UA0090 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,138 $2,200 Implemented
UA0090 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,484 $12,249 Not Implemented
IA0490 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,645 $19,693 Implemented
IA0490 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $333 $478 Not Implemented
IA0490 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,882 $1,500 Implemented
IA0490 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,416 $1,260 Implemented
IA0490 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,136 $1,440 Not Implemented
LE0344 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,461 $11,250 Not Implemented
LE0344 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $3,730 $10,374 Not Implemented
LE0344 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,467 $6,930 Not Implemented
LE0344 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,478 $9,168 Not Implemented
LE0344 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,850 $1,000 Not Implemented
LE0344 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,371 $375 Implemented
LE0344 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $653 $40 Implemented
LE0344 # 08 Y:2012 08 2012 INSTALL TIMERS AND/OR THERMOSTATS $16,963 $150 Not Implemented
LE0344 # 09 Y:2012 09 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,214 $400 Not Implemented
LE0344 # 10 Y:2012 10 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,002 $1,500 Not Implemented
UM0415 # 01 Y:2012 01 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,072 $4,000 Not Implemented
UM0415 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $822 $875 Implemented
UM0415 # 03 Y:2012 03 2012 OPTIMIZE PLANT POWER FACTOR $12,081 $20,000 Not Implemented
UM0415 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,832 $10,965 Not Implemented
UM0415 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,600 $1,000 Implemented
UM0415 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $1,697 $1,500 Not Implemented