IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

240

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2202 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $649 $0 Not Implemented
UL2202 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,677 $0 Implemented
UL2202 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,861 $12,941 Implemented
UL2202 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $23,158 $0 Implemented
UK1915 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,983 $21,695 n/a
UK1915 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,711 $2,510 n/a
UK1915 # 02 Y:2019 02 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $7,951 $17,032 n/a
UK1915 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $259 $260 n/a
UK1915 # 05 Y:2019 05 2019 REPLACE TREATED WATER WITH WELL / SURFACE WATER $53,903 $10,200 n/a
UK1915 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $13,534 $26,305 n/a
UK1915 # 07 Y:2019 07 2019 OPTIMIZE PLANT POWER FACTOR $127,719 $54,495 n/a
UK1901 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,843 $2,270 Implemented
UK1901 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,739 $5,715 Not Implemented
UK1901 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,381 $750 Implemented
UK1901 # 04 Y:2019 04 2019 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $22,646 $20,000 Not Implemented
UK1901 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $507 $245 Implemented
UK1901 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $283 $520 Implemented
UK1901 # 07 Y:2019 07 2019 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $9,301 $7,515 Not Implemented
UK1901 # 08 Y:2019 08 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,566 $188 Not Implemented
UK1901 # 14 Y:2019 14 2019 INSULATE BARE EQUIPMENT $110 $270 Not Implemented
UK1901 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,440 $106,123 Implemented
UK1901 # 16 Y:2019 16 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,281 $1,000 Implemented
UK1901 # 15 Y:2019 15 2019 COVER OPEN TANKS $6,024 $5,000 Not Implemented
UK1901 # 12 Y:2019 12 2019 ELIMINATE LEAKS IN WATER LINES AND VALVES $467 $360 Not Implemented
UK1901 # 10 Y:2019 10 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $265 $550 Not Implemented