IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

374

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0178 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,180 $3,286 Implemented
IC0178 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,171 $709 Not Implemented
IC0178 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,297 $244 Not Implemented
IC0178 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,221 $14,399 Implemented
IC0178 # 09 Y:2010 09 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,110 $0 Implemented
IC0178 # 10 Y:2010 10 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $694 $0 Not Implemented
GT0877 # 01 Y:2010 01 2010 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $392,100 $250,000 Not Implemented
MI0197 # 01 Y:2010 01 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,798 $2,550 Not Implemented
MI0197 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,774 $1,210 Implemented
MI0197 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,594 $40 Not Implemented
MI0197 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,824 $7,562 Not Implemented
MI0197 # 05 Y:2010 05 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,359 $2,850 Not Implemented
MI0197 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,187 $180 Implemented
MI0197 # 07 Y:2010 07 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,983 $2,040 Implemented
UA0057 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,876 $3,000 Implemented
UA0057 # 02 Y:2010 02 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,848 $80 Implemented
UA0057 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $4,400 $2,080 Implemented
UA0057 # 04 Y:2010 04 2010 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,362 $71,030 Not Implemented
UA0057 # 05 Y:2010 05 2010 USE PHOTOCELL CONTROLS $8,910 $1,742 Not Implemented
UA0057 # 06 Y:2010 06 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,885 $250 Not Implemented
UA0057 # 07 Y:2010 07 2010 INSTALL TIMERS AND/OR THERMOSTATS $3,185 $1,020 Not Implemented
UA0057 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,029 $12,535 Not Implemented
UA3004 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $655 $1,000 Implemented
LL0335 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,558 $4,290 Implemented
LL0335 # 02 Y:2010 02 2010 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $6,028 $720 Not Implemented