Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,517
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0826 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,167 | $23,331 | Not Implemented |
GT0826 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $746 | $400 | Not Implemented |
GT0826 # 06 Y:2006 | 06 | 2006 | COMBINE UTILITY METERS | $2,907 | $7,120 | Not Implemented |
GT0826 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $282 | $234 | Not Implemented |
MI0131 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,001 | $40,224 | Implemented |
MI0131 # 02 Y:2006 | 02 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $41,642 | $6,538 | Implemented |
MI0131 # 03 Y:2006 | 03 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $16,391 | $29,320 | Implemented |
MI0131 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,321 | $1,074 | Implemented |
MI0131 # 05 Y:2006 | 05 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,701 | $180 | Implemented |
MI0131 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $5,552 | $216 | Implemented |
MI0131 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,332 | $0 | Implemented |
MI0131 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,254 | $30 | Implemented |
BD0314 # 01 Y:2006 | 01 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $9,543 | $0 | Not Implemented |
BD0314 # 02 Y:2006 | 02 | 2006 | USE SYNTHETIC LUBRICANT | $1,020 | $1,500 | Not Implemented |
BD0314 # 03 Y:2006 | 03 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $491 | $1,250 | Implemented |
BD0314 # 04 Y:2006 | 04 | 2006 | USE RADIANT HEATER FOR SPOT HEATING | $7,677 | $9,600 | Not Implemented |
BD0314 # 05 Y:2006 | 05 | 2006 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $1,824 | $1,200 | Not Implemented |
BD0314 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,382 | $4,955 | Not Implemented |
BD0314 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $1,221 | $525 | Not Implemented |
BD0314 # 08 Y:2006 | 08 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $421 | $1,230 | Not Implemented |
AS0423 # 01 Y:2006 | 01 | 2006 | CONDENSE OPERATION INTO ONE BUILDING | $205,767 | $2,100,000 | n/a |
AS0423 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,786 | $1,000 | n/a |
AS0423 # 03 Y:2006 | 03 | 2006 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $13,786 | $13,000 | n/a |
AS0423 # 04 Y:2006 | 04 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $13,316 | $10,000 | n/a |
AS0423 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,912 | $10,000 | n/a |