IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,517

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0363 # 10 Y:2005 10 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,056 $18,500 Not Implemented
SF0304 # 01 Y:2005 01 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $17,326 $0 Not Implemented
SF0304 # 02 Y:2005 02 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $871 $0 Not Implemented
SF0304 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,751 $0 Implemented
SF0304 # 04 Y:2005 04 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,623 $0 Not Implemented
SF0304 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,248 $499 Not Implemented
SF0304 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $465 $588 Not Implemented
SF0304 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $598 $848 Not Implemented
SF0304 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $1,062 $1,832 Not Implemented
SF0304 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,442 $19,385 Not Implemented
SF0304 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,879 $12,894 Not Implemented
AM0489 # 01 Y:2005 01 2005 MODIFY CURRENT INCENTIVE PROGRAM $6,000 $6,000 Not Implemented
AM0489 # 02 Y:2005 02 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,140 $0 Implemented
AM0489 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,500 $5,200 Implemented
AM0489 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,760 $1,000 Implemented
AM0489 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,700 $500 Not Implemented
LE0212 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $600,960 $1,440,000 Not Implemented
LE0212 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $38,827 $28,400 Implemented
LE0212 # 03 Y:2005 03 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,161 $2,500 Not Implemented
LE0212 # 04 Y:2005 04 2005 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $13,784 $37,000 Not Implemented
LE0212 # 05 Y:2005 05 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $9,210 $1,000 Not Implemented
LE0212 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $6,490 $1,925 Implemented
LE0212 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,111 $1,500 Implemented
LE0212 # 08 Y:2005 08 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $4,055 $350 Implemented
LE0212 # 09 Y:2005 09 2005 COVER OPEN TANKS $2,850 $2,274 Not Implemented