IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,517

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0265 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,775 $59,467 Implemented
MS0265 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,523 $32,157 Not Implemented
MS0265 # 03 Y:2004 03 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,480 $2,430 Not Implemented
MS0265 # 04 Y:2004 04 2004 BURN WASTE OIL FOR HEAT $3,362 $3,129 Not Implemented
MS0265 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,680 $189 Implemented
MS0265 # 06 Y:2004 06 2004 INSTALL TIMERS AND/OR THERMOSTATS $791 $472 Not Implemented
MS0265 # 07 Y:2004 07 2004 SHUT OFF PILOTS IN STANDBY EQUIPMENT $774 $176 Not Implemented
MS0264 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,471 $84,783 Implemented
MS0264 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,737 $318 Implemented
MS0264 # 03 Y:2004 03 2004 AIR CONDITION ONLY SPACE NECESSARY $2,457 $480 Not Implemented
MS0264 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,356 $1,624 Not Implemented
MS0264 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $989 $944 Not Implemented
MS0264 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $183 $249 Not Implemented
TA0089 # 01 Y:2004 01 2004 MOVE BOILER TO MORE EFFICIENT LOCATION $87,420 $4,860 Implemented
TA0089 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,060 $540 Implemented
TA0089 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $10,000 $3,200 Implemented
TA0089 # 04 Y:2004 04 2004 USE MINIMUM SAFE OVEN VENTILATION $1,890 $1,500 Implemented
TA0089 # 05 Y:2004 05 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,740 $0 Implemented
SD0354 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,786 $68,250 Not Implemented
SD0354 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,143 $43,000 Not Implemented
SD0354 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,424 $320 Implemented
SD0354 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,367 $18,600 Implemented
SD0354 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,079 $398 Implemented
IC0090 # 01 Y:2004 01 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,317 $0 Implemented
IC0090 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,918 $300 Implemented