IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,512

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0251 # 02 Y:2004 02 2004 UPGRADE CONTROLS ON COMPRESSORS $35,085 $20,225 Implemented
UM0251 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $26,517 $31,338 n/a
UM0251 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,376 $21,876 n/a
UM0251 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,592 $100 Not Implemented
UM0251 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,590 $100 Implemented
WV0286 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,216 $7,012 Not Implemented
WV0286 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $4,469 $3,580 Implemented
WV0286 # 03 Y:2004 03 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,072 $360 Implemented
WV0286 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,971 $250 Implemented
WV0286 # 05 Y:2004 05 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,455 $1,770 Implemented
WV0286 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,353 $251 Implemented
WV0286 # 07 Y:2004 07 2004 DEVELOP A REPAIR/REPLACE POLICY $1,083 $375 Not Implemented
WV0286 # 08 Y:2004 08 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $993 $1,000 Not Implemented
WV0286 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $0 Implemented
WV0286 # 10 Y:2004 10 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $828 $283 Implemented
WV0286 # 11 Y:2004 11 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $743 $1,100 Implemented
WV0286 # 12 Y:2004 12 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $250 Implemented
MA0548 # 01 Y:2004 01 2004 REDUCE VENTILATION AIR $13,881 $4,244 Not Implemented
MA0548 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,950 $4,150 Not Implemented
MA0548 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,609 $19,680 n/a
MA0548 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $4,665 $1,100 Implemented
MA0548 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $1,528 $1,625 Not Implemented
MA0548 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $699 $3,574 Not Implemented
MA0548 # 07 Y:2004 07 2004 RECOVER WASTE HEAT FROM EQUIPMENT $653 $200 Not Implemented
MA0548 # 08 Y:2004 08 2004 REDUCE VENTILATION AIR $607 $1,831 Not Implemented