Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,512
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0374 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,873 | $1,872 | Not Implemented |
AS0374 # 06 Y:2004 | 06 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $106 | $51 | Implemented |
LL0182 # 01 Y:2004 | 01 | 2004 | REPLACE BOILER | $172,411 | $79,000 | Not Implemented |
LL0182 # 02 Y:2004 | 02 | 2004 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $54,044 | $325,479 | Not Implemented |
LL0182 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,248 | $33,150 | Implemented |
LL0182 # 04 Y:2004 | 04 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $35,377 | $500 | Implemented |
LL0182 # 05 Y:2004 | 05 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $35,354 | $60,000 | Implemented |
LL0182 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,593 | $12,360 | Implemented |
LL0182 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $18,697 | $3,264 | Implemented |
LL0182 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,036 | $74,480 | Implemented |
LL0182 # 09 Y:2004 | 09 | 2004 | USE POWER DURING OFF-PEAK PERIODS | $7,577 | $8,004 | Implemented |
LL0182 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,481 | $1,542 | Implemented |
LL0182 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,164 | $1,680 | Implemented |
LL0182 # 12 Y:2004 | 12 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,268 | $9,300 | Implemented |
AS0373 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,560 | $8,230 | Not Implemented |
AS0373 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $504 | $456 | Not Implemented |
AS0373 # 03 Y:2004 | 03 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $337 | $1,400 | Not Implemented |
AS0373 # 04 Y:2004 | 04 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $28,518 | $60,100 | Not Implemented |
AS0373 # 05 Y:2004 | 05 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,794 | $3,500 | Not Implemented |
AM0457 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,750 | $21 | Implemented |
AM0457 # 02 Y:2004 | 02 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,360 | $4,370 | Implemented |
AM0457 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,270 | $120 | Implemented |
AM0457 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $790 | $500 | Implemented |
AM0457 # 05 Y:2004 | 05 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $265 | $130 | Implemented |
AM0457 # 06 Y:2004 | 06 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $230 | $0 | Implemented |