IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,507

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0436 # 08 Y:2003 08 2003 INSULATE BARE EQUIPMENT $280 $75 Implemented
AM0436 # 09 Y:2003 09 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $700 $40 Implemented
AM0436 # 10 Y:2003 10 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $100 $0 Not Implemented
MA0530 # 01 Y:2003 01 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $233,841 $25,050 n/a
MA0530 # 02 Y:2003 02 2003 IMPROVE SPACE COMFORT CONDITIONING $56,030 $207,000 n/a
MA0530 # 03 Y:2003 03 2003 CLEAR AND RENT EXISTING SPACE $83,099 $162,400 Not Implemented
MA0530 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,234 $30,400 n/a
MA0530 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,046 $9,100 Not Implemented
MA0530 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $8,396 $9,900 Not Implemented
MA0530 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,661 $400 Implemented
MA0530 # 08 Y:2003 08 2003 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $8,213 $26,700 Not Implemented
MA0530 # 09 Y:2003 09 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,271 $2,750 Implemented
MA0530 # 10 Y:2003 10 2003 PAY BILLS ON TIME TO AVOID LATE FEES $692 $1,275 Implemented
AM0435 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,300 $500 Implemented
AM0435 # 02 Y:2003 02 2003 USE SYNTHETIC LUBRICANT $12,740 $0 Not Implemented
AM0435 # 03 Y:2003 03 2003 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $4,670 $0 Not Implemented
AM0435 # 04 Y:2003 04 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,100 $0 Implemented
AM0435 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $950 $235 Not Implemented
AM0435 # 06 Y:2003 06 2003 USE PHOTOCELL CONTROLS $775 $75 Implemented
WI0442 # 01 Y:2003 01 2003 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $188,665 $146,300 Not Implemented
WI0442 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,332 $6,498 Not Implemented
WI0442 # 03 Y:2003 03 2003 USE POWER DURING OFF-PEAK PERIODS $5,132 $0 Not Implemented
WI0442 # 04 Y:2003 04 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,640 $10,000 Not Implemented
WI0442 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,559 $500 Not Implemented
IC0057 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,372 $9,932 Not Implemented