IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,512

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0156 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $2,283 $995 Implemented
SU0156 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,534 $327 Implemented
SU0156 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,059 $0 Implemented
AS0346 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,888 $30 Implemented
AS0346 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,284 $30 Implemented
AS0346 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,718 $9,268 Not Implemented
AS0346 # 04 Y:2003 04 2003 INSTALL SKYLIGHTS $2,387 $5,219 Not Implemented
AS0346 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,550 $2,600 n/a
AS0346 # 06 Y:2003 06 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $121 $0 Implemented
AS0346 # 07 Y:2003 07 2003 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $1,212 $44 Not Implemented
UD0663 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $82,700 $234,000 Not Implemented
UD0663 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $64,670 $0 Implemented
UD0663 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $36,762 $87,200 Not Implemented
UD0663 # 04 Y:2003 04 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $36,720 $4,800 Not Implemented
UD0663 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,589 $102,000 Not Implemented
UD0663 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $24,572 $0 Not Implemented
UD0663 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,728 $4,941 Not Implemented
UD0663 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $975 Not Implemented
UD0663 # 09 Y:2003 09 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,042 $368 Not Implemented
UD0663 # 10 Y:2003 10 2003 COVER OPEN TANKS $760 $1,870 Not Implemented
UU0039 # 01 Y:2003 01 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,610 $9,000 Implemented
UU0039 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,754 $600 Implemented
UU0039 # 03 Y:2003 03 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,286 $1,085 Implemented
UU0039 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,929 $300 Not Implemented
UU0039 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $1,012 $832 Not Implemented