IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,507

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0052 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $199 $0 Implemented
LM0052 # 02 Y:2003 02 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,113 $0 Implemented
LM0052 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,671 $2,725 Not Implemented
LM0052 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $143 $100 Not Implemented
LM0052 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $520 $0 Implemented
LM0052 # 06 Y:2003 06 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $120,656 $39,410 n/a
LM0052 # 07 Y:2003 07 2003 ADVERTISE PRODUCT OR SERVICE $126,133 $2,000 Not Implemented
CO0522 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,140 $10,660 Not Implemented
CO0522 # 02 Y:2003 02 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,420 $10,000 Not Implemented
CO0522 # 03 Y:2003 03 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,300 $840 Not Implemented
CO0522 # 04 Y:2003 04 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,870 $1,950 Not Implemented
CO0522 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $414 Not Implemented
CO0522 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $184 $308 Not Implemented
UD0660 # 01 Y:2003 01 2003 DEVELOP STANDARD OPERATING PROCEDURES $280,000 $58,320 n/a
UD0660 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,779 $0 Implemented
UD0660 # 03 Y:2003 03 2003 FILTER AND REUSE HYDRAULIC OIL $19,375 $4,323 Not Implemented
UD0660 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $15,291 $7,000 Not Implemented
UD0660 # 05 Y:2003 05 2003 REDUCE VENTILATION AIR $8,388 $15,000 Implemented
UD0660 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,666 $1,124 Not Implemented
UD0660 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,568 $6,545 Not Implemented
UD0660 # 08 Y:2003 08 2003 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $5,026 $8,400 Implemented
UD0660 # 09 Y:2003 09 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,983 $14,150 Not Implemented
UD0660 # 10 Y:2003 10 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,648 $0 Not Implemented
UD0660 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,905 $7,338 Not Implemented
UD0660 # 12 Y:2003 12 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,763 $3,318 Implemented