IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11,126

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0679 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,739 $3,618 n/a
UD0679 # 11 Y:2003 11 2003 INSTALL OCCUPANCY SENSORS $232 $110 n/a
UU0053 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,354 $4,100 Not Implemented
UU0053 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,131 $55 Not Implemented
UU0053 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,710 $2,000 Not Implemented
UU0053 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,112 $70,635 Not Implemented
UU0053 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,869 $2,340 Implemented
UU0053 # 06 Y:2003 06 2003 INSTALL TURBULATORS $2,610 $1,572 Not Implemented
SU0165 # 01 Y:2003 01 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $99,450 $110,400 Implemented
SU0165 # 02 Y:2003 02 2003 RECOVER AND REUSE SPENT ACID BATHS $30,138 $3,234 Implemented
SU0165 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,370 $17,064 Implemented
SU0165 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,503 $937 Implemented
SU0165 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $9,177 $20,736 Not Implemented
SU0165 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,763 $5,538 Not Implemented
SU0165 # 07 Y:2003 07 2003 UPGRADE CONTROLS ON COMPRESSORS $93,620 $94,691 Implemented
MS0233 # 01 Y:2003 01 2003 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $200,928 $9,650 Implemented
MS0233 # 02 Y:2003 02 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $67,762 $79,500 Not Implemented
MS0233 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $19,274 $21,420 Implemented
MS0233 # 04 Y:2003 04 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,291 $36,800 Implemented
MS0233 # 05 Y:2003 05 2003 INSTALL TIMERS AND/OR THERMOSTATS $11,372 $2,900 Implemented
MS0233 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,999 $748 Implemented
MS0233 # 07 Y:2003 07 2003 USE SYNTHETIC LUBRICANT $3,787 $1,210 Implemented
MS0233 # 08 Y:2003 08 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,622 $1,535 Not Implemented
MS0233 # 09 Y:2003 09 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $579 $968 Implemented
AM0443 # 01 Y:2003 01 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $51,825 $25,200 n/a