Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
382
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0428 # 04 Y:2013 | 04 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $636 | $1,200 | Implemented |
UM0428 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,177 | $9,000 | Implemented |
UM0428 # 06 Y:2013 | 06 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,332 | $500 | Not Implemented |
UM0422 # 03 Y:2013 | 03 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $29,593 | $14,120 | Implemented |
UM0422 # 02 Y:2013 | 02 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,633 | $500 | Implemented |
UM0422 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,550 | $15,331 | Not Implemented |
UM0419 # 03 Y:2013 | 03 | 2013 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $9,991 | $0 | Not Implemented |
UM0419 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,967 | $4,350 | Not Implemented |
UM0419 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,593 | $200 | Not Implemented |
UM0415 # 05 Y:2012 | 05 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23,600 | $1,000 | Implemented |
UM0415 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $822 | $875 | Implemented |
UM0415 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,072 | $4,000 | Not Implemented |
UM0415 # 03 Y:2012 | 03 | 2012 | OPTIMIZE PLANT POWER FACTOR | $12,081 | $20,000 | Not Implemented |
UM0415 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $1,697 | $1,500 | Not Implemented |
UM0415 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,832 | $10,965 | Not Implemented |
UM0413 # 06 Y:2012 | 06 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $566 | $100 | Not Implemented |
UM0413 # 05 Y:2012 | 05 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,975 | $1,500 | Not Implemented |
UM0413 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,256 | $200 | Not Implemented |
UM0413 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,508 | $2,500 | Implemented |
UM0413 # 02 Y:2012 | 02 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,595 | $1,000 | Not Implemented |
UM0413 # 01 Y:2012 | 01 | 2012 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,930 | $1,000 | Implemented |
UM0412 # 06 Y:2012 | 06 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,939 | $4,000 | Not Implemented |
UM0412 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $874 | $1,000 | Implemented |
UM0412 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,308 | $2,850 | Implemented |
UM0412 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $775 | $100 | Not Implemented |