IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

352

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0256 # 06 Y:2018 06 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,110 $3,000 Not Implemented
MZ0256 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $4,834 $26,380 Not Implemented
MZ0256 # 08 Y:2018 08 2018 USE SOLAR HEAT TO HEAT WATER $6,041 $66,682 Not Implemented
SD0568 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,647 $2,000 Implemented
SD0568 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,096 $0 Implemented
SD0568 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $742 $3,292 Implemented
SD0568 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $659 $2,850 Not Implemented
SD0568 # 05 Y:2018 05 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $475 $2,150 Not Implemented
WV0561 # 01 Y:2018 01 2018 INSTALL SET-BACK TIMERS $15,007 $2,522 Implemented
WV0561 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,102 $13,629 Implemented
WV0561 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,765 $1,784 Implemented
WV0561 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,742 $171 Implemented
WV0561 # 05 Y:2018 05 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,253 $6,000 Not Implemented
WV0561 # 06 Y:2018 06 2018 MINIMIZE WATER USAGE $535 $1,400 Implemented
WV0561 # 07 Y:2018 07 2018 DEVELOP A REPAIR/REPLACE POLICY $471 $696 Implemented
WV0561 # 08 Y:2018 08 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $321 $34 Implemented
IC0205 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $1,769 Implemented
IC0205 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,390 $4,470 Implemented
IC0205 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,439 $0 Implemented
IC0205 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $611 $2,300 Not Implemented
IC0205 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $631 $50 Not Implemented
IC0205 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,523 $30 Implemented
IC0205 # 07 Y:2018 07 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,754 $1,197 Not Implemented
MI0335 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $4,545 $3,280 Implemented
MI0335 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,167 $8,063 Implemented