Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
322
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0360 # 02 Y:2024 | 02 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $8,851 | $11,852 | n/a |
MZ0360 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,978 | $18,853 | n/a |
MZ0360 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,193 | $8,300 | n/a |
MZ0360 # 01 Y:2024 | 01 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,834 | $5,300 | n/a |
MZ0358 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,322 | $200 | n/a |
MZ0358 # 07 Y:2024 | 07 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $4,887 | $14,220 | n/a |
MZ0358 # 06 Y:2024 | 06 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,666 | $2,000 | n/a |
MZ0358 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,179 | $320 | n/a |
MZ0358 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,826 | $1,760 | n/a |
MZ0358 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,335 | $1,200 | n/a |
MZ0358 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $1,050 | $2,050 | n/a |
MZ0336 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $774 | $0 | Not Implemented |
MZ0336 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,963 | $2,020 | Implemented |
MZ0336 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,688 | $5,500 | Not Implemented |
MZ0336 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,782 | $11,200 | Implemented |
MZ0336 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,175 | $53,900 | Implemented |
MZ0336 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $154,719 | $1,434,375 | Not Implemented |
MZ0326 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,449 | $3,200 | Implemented |
MZ0326 # 06 Y:2022 | 06 | 2022 | OPTIMIZE PLANT POWER FACTOR | $1,106 | $2,244 | Implemented |
MZ0326 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,930 | $12,076 | Implemented |
MZ0326 # 08 Y:2022 | 08 | 2022 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $116,541 | $552,315 | Not Implemented |
MZ0326 # 11 Y:2022 | 11 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $384,733 | $2,868,753 | Implemented |
MZ0326 # 07 Y:2022 | 07 | 2022 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $597 | $580 | Implemented |
MZ0326 # 04 Y:2022 | 04 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $874 | $140 | Not Implemented |
MZ0326 # 10 Y:2022 | 10 | 2022 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,954 | $1,170 | Not Implemented |