IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0455 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $716 $0 Not Implemented
WI0455 # 01 Y:2003 01 2003 $17,710 $2,500 Implemented
WI0455 # 03 Y:2003 03 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,687 $1,000 Not Implemented
WI0455 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,232 $1,240 Not Implemented
WI0455 # 04 Y:2003 04 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,787 $0 Not Implemented
WI0455 # 02 Y:2003 02 2003 $12,503 $2,000 Not Implemented
WI0453 # 02 Y:2003 02 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,445 $40,000 Not Implemented
WI0453 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $47,771 $18,500 Not Implemented
WI0453 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,121 $1,280 Implemented
WI0453 # 06 Y:2003 06 2003 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,657 $20,000 Not Implemented
WI0453 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,041 $18,315 Implemented
WI0453 # 04 Y:2003 04 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,824 $8,700 Not Implemented
WI0452 # 08 Y:2003 08 2003 USE OPTIMUM THICKNESS INSULATION $1,592 $687 Not Implemented
WI0452 # 01 Y:2003 01 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $54,337 $72,000 n/a
WI0452 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,926 $8,580 Not Implemented
WI0452 # 06 Y:2003 06 2003 INSTALL TIMERS AND/OR THERMOSTATS $4,063 $1,000 Not Implemented
WI0452 # 05 Y:2003 05 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $4,710 $0 Not Implemented
WI0452 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $4,850 $2,700 Not Implemented
WI0452 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $5,692 $12,000 Not Implemented
WI0452 # 02 Y:2003 02 2003 BURN WASTE OIL FOR HEAT $44,636 $30,000 Not Implemented
WI0445 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $422 $640 Implemented
WI0445 # 01 Y:2003 01 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $4,725 $0 Implemented
WI0445 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,188 $4,400 Not Implemented
WI0445 # 02 Y:2003 02 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,022 $10,000 n/a
WI0445 # 05 Y:2003 05 2003 UPGRADE CONTROLS ON COMPRESSORS $1,111 $2,500 Not Implemented