IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,058

matching recommendations
Reset
NAICS 3321 Forging and Stamping
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0101 # 11 Y:2005 11 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $893 $1,023 Not Implemented
TA0093 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,635 $390 Not Implemented
TA0093 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,125 $10 Not Implemented
TA0093 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,560 $0 Not Implemented
TA0093 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,110 $0 Not Implemented
TA0093 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $1,430 Not Implemented
AM0484 # 01 Y:2005 01 2005 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $19,500 $700 Not Implemented
AM0484 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,500 $1,740 Implemented
AM0484 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,560 $360 Implemented
AM0484 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,000 $20 Implemented
AM0484 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $600 $0 Implemented
AM0484 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $410 $470 Not Implemented
AM0484 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $400 Implemented
UM0274 # 01 Y:2005 01 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,936 $135,000 Not Implemented
UM0274 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,622 $2,000 Not Implemented
UM0274 # 03 Y:2005 03 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,242 $0 Implemented
UM0274 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,966 $200 Not Implemented
UM0274 # 05 Y:2005 05 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,699 $700 Not Implemented
UM0274 # 06 Y:2005 06 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $791 $2,000 Not Implemented
MA0568 # 01 Y:2005 01 2005 $174,960 $252,000 Not Implemented
MA0568 # 02 Y:2005 02 2005 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $20,082 $7,750 Implemented
MA0568 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,788 $12,000 Implemented
MA0568 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $5,122 $6,750 Implemented
MA0568 # 05 Y:2005 05 2005 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $4,092 $6,000 Implemented
MA0568 # 06 Y:2005 06 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,459 $2,888 Not Implemented