IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,062

matching recommendations
Reset
NAICS 33211 Forging and Stamping
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0065 # 05 Y:2016 05 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,760 $93 Implemented
IP0065 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $483 $198 Implemented
IP0065 # 07 Y:2016 07 2016 MINIMIZE WATER USAGE $9,506 $6,223 Not Implemented
IP0065 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $330 $293 Not Implemented
IP0065 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $826 $840 Implemented
IP0065 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $519 $576 Not Implemented
IP0065 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,693 $11,326 Implemented
IP0065 # 12 Y:2016 12 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $548 $957 Implemented
SD0526 # 01 Y:2016 01 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $140,004 $382,500 Not Implemented
SD0526 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $47,293 $24,000 Implemented
SD0526 # 03 Y:2016 03 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,404 $21,190 Not Implemented
SD0526 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,809 $31,775 Implemented
SD0526 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,525 $47,892 Not Implemented
SD0526 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,423 $1,500 Implemented
SD0526 # 07 Y:2016 07 2016 INSTALL SET-BACK TIMERS $14,249 $344 Not Implemented
SD0526 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,558 $200 Not Implemented
SD0526 # 09 Y:2016 09 2016 USE PHOTOCELL CONTROLS $2,988 $1,850 Not Implemented
SD0526 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,761 $1,620 Not Implemented
SD0526 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $513 $2,320 Not Implemented
MA0750 # 01 Y:2015 01 2015 REDUCE VENTILATION AIR $18,184 $10,420 Not Implemented
MA0750 # 02 Y:2015 02 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,398 $7,000 Not Implemented
MA0750 # 03 Y:2015 03 2015 REDUCE VENTILATION AIR $15,229 $15,000 Not Implemented
MA0750 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,208 $3,000 Not Implemented
MA0750 # 05 Y:2015 05 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $5,289 $2,500 Not Implemented
MA0750 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,138 $9,144 Not Implemented