Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,062
matching recommendationsNAICS | 33211 | Forging and Stamping |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0489 # 06 Y:2014 | 06 | 2014 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,770 | $1,000 | Not Implemented |
WV0489 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,213 | $2,425 | Implemented |
WV0489 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,258 | $271 | Implemented |
WV0489 # 09 Y:2014 | 09 | 2014 | INSTALL OCCUPANCY SENSORS | $965 | $620 | Not Implemented |
WV0489 # 10 Y:2014 | 10 | 2014 | INSTALL SET-BACK TIMERS | $812 | $1,375 | Not Implemented |
WV0489 # 11 Y:2014 | 11 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $564 | $443 | Not Implemented |
NC0511 # 01 Y:2014 | 01 | 2014 | ADOPT IN-HOUSE MATERIAL GENERATION | $53,232 | $125,000 | Not Implemented |
NC0511 # 02 Y:2014 | 02 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $29,302 | $53,000 | Not Implemented |
NC0511 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,743 | $450 | Not Implemented |
NC0511 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,802 | $50 | Not Implemented |
NC0511 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,307 | $5,081 | Not Implemented |
NC0511 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $11,995 | $2,335 | Not Implemented |
NC0511 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,667 | $100 | Not Implemented |
CO0681 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,480 | $13,140 | Not Implemented |
CO0681 # 02 Y:2014 | 02 | 2014 | INSULATE BARE EQUIPMENT | $3,470 | $900 | Not Implemented |
CO0681 # 03 Y:2014 | 03 | 2014 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $175,400 | $229,810 | Implemented |
CO0681 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,610 | $8,490 | Not Implemented |
SU0341 # 01 Y:2013 | 01 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $357 | $0 | Implemented |
SU0341 # 02 Y:2013 | 02 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $314 | $0 | Implemented |
SU0341 # 03 Y:2013 | 03 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $299 | $0 | Implemented |
SU0341 # 04 Y:2013 | 04 | 2013 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $31 | $0 | Not Implemented |
SU0341 # 05 Y:2013 | 05 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $626 | $137 | Implemented |
AM0636 # 01 Y:2013 | 01 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $12,500 | $5,000 | Implemented |
AM0636 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,600 | $900 | Implemented |
AM0636 # 03 Y:2013 | 03 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,250 | $2,280 | Not Implemented |