IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,062

matching recommendations
Reset
NAICS 33211 Forging and Stamping
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0489 # 06 Y:2014 06 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,770 $1,000 Not Implemented
WV0489 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,213 $2,425 Implemented
WV0489 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,258 $271 Implemented
WV0489 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $965 $620 Not Implemented
WV0489 # 10 Y:2014 10 2014 INSTALL SET-BACK TIMERS $812 $1,375 Not Implemented
WV0489 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $564 $443 Not Implemented
NC0511 # 01 Y:2014 01 2014 ADOPT IN-HOUSE MATERIAL GENERATION $53,232 $125,000 Not Implemented
NC0511 # 02 Y:2014 02 2014 UPGRADE CONTROLS ON COMPRESSORS $29,302 $53,000 Not Implemented
NC0511 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $7,743 $450 Not Implemented
NC0511 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,802 $50 Not Implemented
NC0511 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,307 $5,081 Not Implemented
NC0511 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $11,995 $2,335 Not Implemented
NC0511 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,667 $100 Not Implemented
CO0681 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,480 $13,140 Not Implemented
CO0681 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $3,470 $900 Not Implemented
CO0681 # 03 Y:2014 03 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $175,400 $229,810 Implemented
CO0681 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,610 $8,490 Not Implemented
SU0341 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $357 $0 Implemented
SU0341 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $314 $0 Implemented
SU0341 # 03 Y:2013 03 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $299 $0 Implemented
SU0341 # 04 Y:2013 04 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $31 $0 Not Implemented
SU0341 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $626 $137 Implemented
AM0636 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,500 $5,000 Implemented
AM0636 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,600 $900 Implemented
AM0636 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,250 $2,280 Not Implemented