Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
371
matching recommendationsNAICS | 332111 | Iron and Steel Forging |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0584 # 01 Y:2019 | 01 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $534,947 | $542,300 | Not Implemented |
WV0584 # 11 Y:2019 | 11 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $876 | $358 | Implemented |
WM0135 # 13 Y:2019 | 13 | 2019 | USE PHOTOCELL CONTROLS | $1,013 | $290 | Not Implemented |
WM0135 # 01 Y:2019 | 01 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $59,838 | $46,000 | Not Implemented |
WM0135 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $44,870 | $52,117 | Implemented |
WM0135 # 03 Y:2019 | 03 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $8,847 | $16,800 | Implemented |
WM0135 # 04 Y:2019 | 04 | 2019 | USE SYNTHETIC LUBRICANT | $7,620 | $25,000 | Implemented |
WM0135 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,539 | $3,900 | Not Implemented |
WM0135 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,828 | $7,410 | Not Implemented |
WM0135 # 08 Y:2019 | 08 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,876 | $0 | Implemented |
WM0135 # 14 Y:2019 | 14 | 2019 | INSTALL OCCUPANCY SENSORS | $970 | $800 | Not Implemented |
WM0135 # 12 Y:2019 | 12 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,255 | $1,513 | Not Implemented |
WM0135 # 11 Y:2019 | 11 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,463 | $880 | Not Implemented |
WM0135 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,712 | $8,360 | Not Implemented |
WM0135 # 09 Y:2019 | 09 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,813 | $3,700 | Not Implemented |
WM0135 # 10 Y:2019 | 10 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,580 | $950 | Not Implemented |
LE0468 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $106,181 | $0 | Not Implemented |
LE0468 # 06 Y:2019 | 06 | 2019 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $726,896 | $16,000,000 | Implemented |
LE0468 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,988 | $50,000 | Implemented |
LE0468 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $58,375 | $186,863 | Implemented |
LE0468 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,956 | $35,000 | Not Implemented |
LE0468 # 02 Y:2019 | 02 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $76,637 | $55,000 | Implemented |
WV0556 # 07 Y:2018 | 07 | 2018 | OPTIMIZE PLANT POWER FACTOR | $7,284 | $14,250 | Implemented |
WV0556 # 14 Y:2018 | 14 | 2018 | MINIMIZE WATER USAGE | $350 | $1,750 | Not Implemented |
WV0556 # 13 Y:2018 | 13 | 2018 | INSULATE BARE EQUIPMENT | $717 | $604 | Implemented |