IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 332111 Iron and Steel Forging
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0225 # 07 Y:2019 07 2019 USE RADIANT HEATER FOR SPOT HEATING $10,365 $18,280 Not Implemented
IC0225 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,711 $3,850 Not Implemented
IC0225 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,947 $3,110 Implemented
IC0225 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,600 $105 Not Implemented
IC0225 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,274 $4,150 Implemented
IC0225 # 01 Y:2019 01 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $44,444 $23,100 Implemented
IC0225 # 06 Y:2019 06 2019 REPAIR OR REPLACE STEAM TRAPS $2,596 $652 Implemented
IC0108 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,427 $0 Not Implemented
IC0108 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $77 $0 Not Implemented
IC0108 # 01 Y:2005 01 2005 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $85,726 $22,992 Not Implemented
IC0108 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $300 Not Implemented
IC0108 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $425 $0 Not Implemented
IC0108 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,400 $0 Not Implemented
BD0237 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $8,921 $5,000 Not Implemented
BD0237 # 08 Y:2003 08 2003 $16,965 $7,000 Not Implemented
BD0237 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $4,857 $2,000 Not Implemented
BD0237 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,331 $0 Not Implemented
BD0237 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,365 $1,275 Not Implemented
BD0237 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $62,620 $10,000 Not Implemented
BD0237 # 07 Y:2003 07 2003 $39,936 $45,000 Not Implemented
BD0237 # 01 Y:2003 01 2003 USE RADIANT HEATER FOR SPOT HEATING $32,297 $56,000 Not Implemented
BD0237 # 10 Y:2003 10 2003 $2,199 $0 Not Implemented
BD0237 # 09 Y:2003 09 2003 $12,480 $25,000 Not Implemented
IC0057 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,069 $2,300 Implemented
IC0057 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,389 $6,391 Not Implemented