IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
NAICS 332117 Powder Metallurgy Part Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0053 # 09 Y:2014 09 2014 IMPROVE SPACE COMFORT CONDITIONING $28,274 $1,139 Not Implemented
WM0053 # 10 Y:2014 10 2014 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,892 $0 Implemented
WM0053 # 11 Y:2014 11 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,232 $4,500 Not Implemented
WM0053 # 12 Y:2014 12 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,677 $19,918 Implemented
WM0053 # 13 Y:2014 13 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $560 $512 Implemented
CO0681 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,480 $13,140 Not Implemented
CO0681 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $3,470 $900 Not Implemented
CO0681 # 03 Y:2014 03 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $175,400 $229,810 Implemented
CO0681 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,610 $8,490 Not Implemented
UD0823 # 01 Y:2010 01 2010 COMBINE UTILITY METERS $6,391 $200 Not Implemented
UD0823 # 02 Y:2010 02 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,915 $25 Not Implemented
UD0823 # 03 Y:2010 03 2010 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $253 $25 Not Implemented
UD0823 # 04 Y:2010 04 2010 INSTALL WIND POWERED ELECTRIC GENERATOR $1,820,272 $1,400,000 Not Implemented
UD0823 # 05 Y:2010 05 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $26,291 $98,085 Not Implemented
UD0823 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $17,201 $7,375 Implemented
UD0823 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $21,736 $125 Not Implemented
UD0823 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,268 $25 Implemented
UD0823 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $500 Not Implemented
UD0823 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $524 $25 Implemented
UD0823 # 11 Y:2010 11 2010 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $19,629 $7,500 Not Implemented
UD0823 # 12 Y:2010 12 2010 USE OPTIMUM TEMPERATURE $3,244 $63 Not Implemented
UD0823 # 13 Y:2010 13 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,010 $50,050 Implemented
UD0823 # 14 Y:2010 14 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,832 $9,160 Not Implemented
UD0823 # 15 Y:2010 15 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $355 $25 Implemented
OK0775 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,182 $0 Implemented