IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 3322 Cutlery and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0482 # 05 Y:2016 05 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $507 $600 Not Implemented
BD0482 # 03 Y:2016 03 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,149 $2,000 Implemented
BD0482 # 07 Y:2016 07 2016 CONVERT TO ELECTROSTATIC POWDER COATING $186,807 $160,000 Implemented
BD0482 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,155 $9,455 Not Implemented
BD0482 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152 $184 Not Implemented
BD0482 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $738 $825 Not Implemented
BD0482 # 02 Y:2016 02 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,096 $840 Implemented
BD0416 # 07 Y:2012 07 2012 USE PHOTOCELL CONTROLS $1,653 $480 Not Implemented
BD0416 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,232 $1,766 Not Implemented
BD0416 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,297 $17,028 Not Implemented
BD0416 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,620 $1,000 Not Implemented
BD0416 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,257 $700 Not Implemented
BD0416 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $689 $10 Not Implemented
BD0416 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $1,981 $975 Not Implemented
BD0416 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $505 $475 Not Implemented
BD0416 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $950 $1,000 Not Implemented
BD0356 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,369 $1,000 Not Implemented
BD0356 # 08 Y:2009 08 2009 RECOVER WASTE HEAT FROM EQUIPMENT $11,712 $6,000 Not Implemented
BD0356 # 07 Y:2009 07 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,823 $43,280 Implemented
BD0356 # 06 Y:2009 06 2009 USE SYNTHETIC LUBRICANT $1,494 $300 Implemented
BD0356 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,914 $300 Implemented
BD0356 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,486 $0 Implemented
BD0356 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $9,054 $10,125 Not Implemented
BD0356 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,972 $37,980 Not Implemented
BD0322 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,695 $1,000 Not Implemented