IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

370

matching recommendations
Reset
NAICS 33221 Cutlery and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0090 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $559 $77 Implemented
IC0090 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,205 $30,427 Not Implemented
WV0298 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,304 $0 Implemented
WV0298 # 01 Y:2004 01 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,459 $2,100 Not Implemented
WV0298 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,929 $440 Implemented
WV0298 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $2,864 $1,928 Not Implemented
WV0298 # 04 Y:2004 04 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,447 $220 Implemented
WV0298 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,066 $1,286 Not Implemented
WV0298 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,986 $0 Not Implemented
WV0298 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,877 $240 Implemented
WV0298 # 09 Y:2004 09 2004 DEVELOP A REPAIR/REPLACE POLICY $736 $705 Implemented
WV0298 # 10 Y:2004 10 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $794 $1,825 Not Implemented
WV0298 # 11 Y:2004 11 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $762 $750 Implemented
WV0298 # 12 Y:2004 12 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $565 $1,000 Not Implemented
WV0298 # 13 Y:2004 13 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $461 $360 Implemented
WI0458 # 04 Y:2004 04 2004 INSTALL TIMERS AND/OR THERMOSTATS $3,959 $7,900 Implemented
WI0458 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,053 $740 Not Implemented
WI0458 # 06 Y:2004 06 2004 UPGRADE CONTROLS ON COMPRESSORS $1,707 $3,500 Not Implemented
WI0458 # 05 Y:2004 05 2004 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,980 $0 Not Implemented
WI0458 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,180 $17,325 Implemented
WI0458 # 02 Y:2004 02 2004 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $6,420 $18,000 Implemented
WI0458 # 03 Y:2004 03 2004 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $4,400 $3,500 Implemented
OR0434 # 01 Y:2003 01 2003 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $78,000 $44,800 n/a
OR0434 # 02 Y:2003 02 2003 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $32,000 $1,500 Not Implemented
OR0434 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $12,600 $5,000 Implemented