IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

263

matching recommendations
Reset
NAICS 332216 Saw Blade and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0605 # 01 Y:2012 01 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,020 $300 Implemented
AM0605 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,270 $17,600 Implemented
AM0605 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,600 $500 Implemented
AM0605 # 05 Y:2012 05 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $15,800 $0 Implemented
AM0605 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,400 $4,500 Not Implemented
AM0605 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $1,700 Implemented
AM0605 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,940 $105 Not Implemented
AM0605 # 09 Y:2012 09 2012 INSTALL OCCUPANCY SENSORS $545 $130 Implemented
AM0605 # 10 Y:2012 10 2012 PAY UTILITY BILLS ON TIME $345 $0 Not Implemented
WV0431 # 08 Y:2011 08 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,027 $1,560 Implemented
WV0431 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $2,808 $408 Implemented
WV0431 # 06 Y:2011 06 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,020 $0 Not Implemented
WV0431 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $6,207 $1,076 Implemented
WV0431 # 04 Y:2011 04 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,105 $1,850 Implemented
WV0431 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,355 $11,500 Not Implemented
WV0431 # 02 Y:2011 02 2011 USE OPTIMUM THICKNESS INSULATION $29,707 $75,000 Not Implemented
WV0431 # 01 Y:2011 01 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $135,254 $682,000 Implemented
MA0673 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $743 $1,800 Not Implemented
MA0673 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $386 $450 Not Implemented
MA0673 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $4,145 $1,370 Implemented
MA0673 # 02 Y:2011 02 2011 USE MINIMUM SAFE OVEN VENTILATION $3,752 $490 Not Implemented
MA0673 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,772 $540 Implemented
MA0673 # 05 Y:2011 05 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,432 $6,475 Not Implemented
MA0673 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,078 $200 Implemented
MA0673 # 04 Y:2011 04 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,179 $8,435 Not Implemented