IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
NAICS 332312 Fabricated Structural Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0495 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,111 $36,548 Not Implemented
SU0495 # 06 Y:2020 06 2020 ELIMINATE/REDUCE AN OPERATION $4,106 $7,548 Not Implemented
SU0495 # 05 Y:2020 05 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $765 $1,343 Not Implemented
SU0495 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $424 $436 Not Implemented
SU0495 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $756 $547 Not Implemented
SU0495 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $703 $55 Not Implemented
SU0438 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,174 $3,708 Implemented
SU0438 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $416 Not Implemented
SU0438 # 04 Y:2017 04 2017 REDUCE VENTILATION AIR $449 $600 Implemented
SU0438 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59 $66 Implemented
SU0438 # 02 Y:2017 02 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $467 $936 Implemented
SU0438 # 01 Y:2017 01 2017 ELIMINATE/REDUCE AN OPERATION $4,956 $2,304 Not Implemented
SU0416 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,930 $18,947 Implemented
SU0416 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $320 $0 Not Implemented
SU0416 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,534 $429 Implemented
SU0416 # 03 Y:2016 03 2016 ELIMINATE/REDUCE AN OPERATION $2,385 $5,280 Implemented
SU0416 # 04 Y:2016 04 2016 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $969 $2,348 Implemented
SU0416 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $124 $418 Implemented
SU0395 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $66 $132 Not Implemented
SU0395 # 01 Y:2015 01 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,070 $3,930 Not Implemented
SU0395 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $103 $86 Implemented
SU0395 # 03 Y:2015 03 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,174 $1,020 Implemented
SU0395 # 04 Y:2015 04 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,740 $7,476 Implemented
SU0395 # 06 Y:2015 06 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,804 $9,736 Not Implemented
SU0243 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $18,077 $0 Implemented