Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
235
matching recommendationsNAICS | 332313 | Plate Work Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0685 # 03 Y:2025 | 03 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,411 | $9,050 | n/a |
WV0685 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $240 | $210 | n/a |
WV0685 # 05 Y:2025 | 05 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,728 | $8,100 | n/a |
WV0685 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,123 | $513 | n/a |
WV0685 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $7,381 | $3,621 | n/a |
WV0685 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,445 | $16,580 | n/a |
WV0685 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $366 | $435 | n/a |
MS0435 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $37,679 | $1,527 | n/a |
MS0435 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $101,423 | $659,750 | n/a |
MS0435 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $10,911 | $100,000 | n/a |
MS0435 # 04 Y:2024 | 04 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,222 | $0 | n/a |
MS0435 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $609 | $2,713 | n/a |
MS0430 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $80 | $1,259 | n/a |
MS0430 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,494 | $0 | n/a |
MS0430 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $41,187 | $175,000 | n/a |
MS0430 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $159,708 | $984,550 | n/a |
MZ0320 # 05 Y:2021 | 05 | 2021 | INSULATE BARE EQUIPMENT | $375 | $389 | Not Implemented |
MZ0320 # 06 Y:2021 | 06 | 2021 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $298 | $1,226 | Not Implemented |
MZ0320 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,470 | $9,762 | Not Implemented |
MZ0320 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $279 | $360 | Implemented |
MZ0320 # 01 Y:2021 | 01 | 2021 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $10,092 | $12,000 | Not Implemented |
MZ0320 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,821 | $240 | Implemented |
MZ0320 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,708 | $15,605 | Implemented |
MZ0316 # 01 Y:2021 | 01 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,730 | $7,800 | Implemented |
MZ0316 # 09 Y:2021 | 09 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,528 | $625 | Not Implemented |