IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

93

matching recommendations
Reset
NAICS 332313 Plate Work Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0320 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $279 $360 Implemented
MZ0320 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,708 $15,605 Implemented
MZ0320 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,821 $240 Implemented
MZ0316 # 07 Y:2021 07 2021 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,786 $11,055 Implemented
MZ0316 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,326 $480 Implemented
MZ0316 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,866 $3,614 Implemented
MZ0316 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $398 $80 Implemented
MZ0316 # 10 Y:2021 10 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,220 $3,485 Implemented
MZ0316 # 01 Y:2021 01 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,730 $7,800 Implemented
AM0800 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,960 $2,460 Implemented
AM0800 # 06 Y:2020 06 2020 USE SYNTHETIC LUBRICANT $395 $150 Implemented
AM0800 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $40 Implemented
AM0800 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,700 $267 Implemented
AM0800 # 03 Y:2020 03 2020 PAY UTILITY BILLS ON TIME $2,148 $0 Implemented
AM0800 # 01 Y:2020 01 2020 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $487,100 $3,000 Implemented
AM0773 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,077 $480 Implemented
AM0773 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13 $10 Implemented
AM0773 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,768 $1,000 Implemented
MI0335 # 07 Y:2018 07 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,235 $2,520 Implemented
MI0335 # 06 Y:2018 06 2018 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1,505 $480 Implemented
MI0335 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,167 $8,063 Implemented
MI0335 # 04 Y:2018 04 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,798 $7,385 Implemented
MI0335 # 08 Y:2018 08 2018 RECOVER WASTE HEAT FROM EQUIPMENT $1,157 $5,370 Implemented
MI0335 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,894 $2,030 Implemented
MI0335 # 05 Y:2018 05 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,932 $7,536 Implemented