IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

228

matching recommendations
Reset
NAICS 332313 Plate Work Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0506 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $10,035 $10,765 Implemented
AM0506 # 02 Y:2006 02 2006 INSTALL SKYLIGHTS $8,850 $20,715 Not Implemented
AM0506 # 03 Y:2006 03 2006 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $5,660 $220 Not Implemented
AM0506 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,555 $8,630 Implemented
AM0506 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,260 $25 Implemented
AM0506 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $950 $250 Implemented
AM0506 # 07 Y:2006 07 2006 REUSE RAGS UNTIL COMPLETELY SOILED $600 $0 Not Implemented
IC0098 # 01 Y:2005 01 2005 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $64,389 $324,232 Not Implemented
IC0098 # 02 Y:2005 02 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,945 $13,700 Implemented
IC0098 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,381 $0 Implemented
IC0098 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $14,532 $1,400 Not Implemented
IC0098 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,517 $0 Not Implemented
IC0098 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,283 $6,200 Not Implemented
MI0071 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $491 $2,100 Implemented
MI0071 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $-1,062 $2,080 Implemented
MI0071 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $808 $2,527 Implemented
MI0071 # 04 Y:2004 04 2004 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $10,520 $2,160 Not Implemented
MI0071 # 05 Y:2004 05 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,800 $2,080 Implemented
MI0071 # 06 Y:2004 06 2004 REDUCE SCRAP PRODUCTION $76,111 $10,040 Not Implemented
MI0071 # 07 Y:2004 07 2004 EXPAND OPERATIONS INTO UNUSED SPACE $3,300 $30 Not Implemented
MI0071 # 08 Y:2004 08 2004 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $53,591 $28,480 Implemented
UU0047 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,212 $710 Implemented
UU0047 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,536 $4,800 Not Implemented
UU0047 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,044 $9,000 Implemented
UU0047 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,693 $0 Not Implemented