IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

447

matching recommendations
Reset
NAICS 33232 Ornamental and Architectural Metal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0288 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,989 $2,500 Implemented
LE0288 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,929 $2,000 Implemented
LE0288 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,531 $76,000 Implemented
LE0288 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,689 $7,272 Implemented
AM0556 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,000 $36,100 Implemented
AM0556 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,800 $1,000 Implemented
AM0556 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,650 $11,713 Implemented
AM0556 # 08 Y:2009 08 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,290 $1,000 Implemented
AM0556 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,730 $8,200 Implemented
MI0174 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $32,694 $2,000 Implemented
MI0174 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,544 $40 Implemented
MI0174 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,041 $1,210 Implemented
MI0174 # 06 Y:2008 06 2008 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,075 $322 Implemented
OK0768 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,704 $17,980 Implemented
OK0768 # 12 Y:2008 12 2008 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,034 $129,640 Implemented
OK0768 # 13 Y:2008 13 2008 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $25,952 $64,800 Implemented
OK0768 # 14 Y:2008 14 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,760 $7,525 Implemented
OK0768 # 15 Y:2008 15 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $131,460 $41,080 Implemented
MZ0022 # 01 Y:2008 01 2008 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,425 $2,800 Implemented
MZ0022 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $900 Implemented
MZ0022 # 03 Y:2008 03 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $11,853 $5,458 Implemented
MZ0022 # 04 Y:2008 04 2008 ELIMINATE/REDUCE AN OPERATION $41,408 $0 Implemented
NC0377 # 01 Y:2008 01 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,484 $2,800 Implemented
NC0377 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,040 $1,000 Implemented
NC0377 # 03 Y:2008 03 2008 DEVELOP A REPAIR/REPLACE POLICY $475 $930 Implemented