IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 33232 Ornamental and Architectural Metal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1068 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,629 $100 Implemented
UD0945 # 12 Y:2016 12 2016 DEVELOP A REPAIR/REPLACE POLICY $3,983 $20,370 Implemented
UD0945 # 11 Y:2016 11 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,976 $0 Implemented
UD0945 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $623 $30 Implemented
UD0945 # 03 Y:2016 03 2016 REDUCE FLUID FLOW RATES $7,163 $0 Implemented
UD0945 # 02 Y:2016 02 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $527 $0 Implemented
UD0945 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,063 $8,000 Implemented
UD0855 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,089 $0 Implemented
UD0855 # 08 Y:2012 08 2012 REDUCE VENTILATION AIR $2,956 $6,600 Implemented
UD0855 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,118 $0 Implemented
UD0855 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,665 $1,000 Implemented
UD0855 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,100 $0 Implemented
UD0845 # 03 Y:2011 03 2011 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,285 $4,000 Implemented
UD0845 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $0 Implemented
UD0831 # 08 Y:2011 08 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $137 $25 Implemented
UD0831 # 07 Y:2011 07 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $189 $240 Implemented
UD0831 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $713 $10,495 Implemented
UD0831 # 03 Y:2011 03 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $4,392 $3,863 Implemented
UD0729 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $19,115 $0 Implemented
UD0729 # 10 Y:2005 10 2005 INSULATE BARE EQUIPMENT $487 $0 Implemented
UD0729 # 07 Y:2005 07 2005 DISCONNECT BALLASTS $8,190 $2,250 Implemented
UD0729 # 06 Y:2005 06 2005 UPGRADE CONTROLS ON COMPRESSORS $11,374 $1,725 Implemented