Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,139
matching recommendationsNAICS | 33232 | Ornamental and Architectural Metal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0512 # 01 Y:2013 | 01 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,448 | $356 | Implemented |
IA0512 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,848 | $100 | Implemented |
IA0512 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,424 | $70 | Implemented |
IA0512 # 04 Y:2013 | 04 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $629 | $890 | Not Implemented |
IA0512 # 05 Y:2013 | 05 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $504 | $530 | Not Implemented |
IA0512 # 06 Y:2013 | 06 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $277 | $200 | Implemented |
IA0512 # 07 Y:2013 | 07 | 2013 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $17,286 | $135,000 | Not Implemented |
CO0670 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,960 | $670 | Implemented |
CO0670 # 02 Y:2013 | 02 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,830 | $25,400 | Not Implemented |
CO0670 # 03 Y:2013 | 03 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,800 | $620 | Implemented |
CO0670 # 04 Y:2013 | 04 | 2013 | INSULATE BARE EQUIPMENT | $1,160 | $330 | Implemented |
CO0670 # 05 Y:2013 | 05 | 2013 | USE EVAPORATION TO CONCENTRATE MATERIAL | $660 | $0 | Implemented |
CO0670 # 06 Y:2013 | 06 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,080 | $500 | Implemented |
BD0430 # 01 Y:2013 | 01 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $7,450 | $22,500 | Not Implemented |
BD0430 # 02 Y:2013 | 02 | 2013 | USE PHOTOCELL CONTROLS | $2,289 | $200 | Not Implemented |
BD0430 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,001 | $3,520 | Not Implemented |
BD0430 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $741 | $25 | Not Implemented |
BD0430 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $397 | $200 | Not Implemented |
BD0430 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $278 | $600 | Not Implemented |
BD0430 # 07 Y:2013 | 07 | 2013 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $4,500 | $10,000 | Implemented |
IP0013 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,266 | $0 | Implemented |
IP0013 # 02 Y:2013 | 02 | 2013 | APPLY FOR INVESTMENT INCENTIVES | $4,197 | $0 | Not Implemented |
IP0013 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $907 | $0 | Not Implemented |
IP0013 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $192 | $0 | Implemented |
IP0013 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,079 | $1,148 | Not Implemented |