Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
43
matching recommendationsNAICS | 33232 | Ornamental and Architectural Metal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0512 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,848 | $100 | Implemented |
IA0512 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,424 | $70 | Implemented |
IA0512 # 04 Y:2013 | 04 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $629 | $890 | Not Implemented |
IA0512 # 05 Y:2013 | 05 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $504 | $530 | Not Implemented |
IA0512 # 06 Y:2013 | 06 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $277 | $200 | Implemented |
IA0512 # 07 Y:2013 | 07 | 2013 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $17,286 | $135,000 | Not Implemented |
IA0512 # 01 Y:2013 | 01 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,448 | $356 | Implemented |
CO0670 # 02 Y:2013 | 02 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,830 | $25,400 | Not Implemented |
CO0670 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,960 | $670 | Implemented |
CO0670 # 03 Y:2013 | 03 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,800 | $620 | Implemented |
CO0670 # 04 Y:2013 | 04 | 2013 | INSULATE BARE EQUIPMENT | $1,160 | $330 | Implemented |
CO0670 # 05 Y:2013 | 05 | 2013 | USE EVAPORATION TO CONCENTRATE MATERIAL | $660 | $0 | Implemented |
CO0670 # 06 Y:2013 | 06 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,080 | $500 | Implemented |
BD0430 # 01 Y:2013 | 01 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $7,450 | $22,500 | Not Implemented |
BD0430 # 02 Y:2013 | 02 | 2013 | USE PHOTOCELL CONTROLS | $2,289 | $200 | Not Implemented |
BD0430 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,001 | $3,520 | Not Implemented |
BD0430 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $741 | $25 | Not Implemented |
BD0430 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $397 | $200 | Not Implemented |
BD0430 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $278 | $600 | Not Implemented |
BD0430 # 07 Y:2013 | 07 | 2013 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $4,500 | $10,000 | Implemented |
IP0013 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $4,447 | $2,744 | Implemented |
IP0013 # 07 Y:2013 | 07 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,251 | $4,863 | Not Implemented |
IP0013 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,079 | $1,148 | Not Implemented |
IP0013 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $192 | $0 | Implemented |
IP0013 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,266 | $0 | Implemented |