IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

492

matching recommendations
Reset
NAICS 3324 Boiler, Tank, and Shipping Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0183 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,441 $7,000 Implemented
TT0183 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,488 $5,100 Implemented
TT0183 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,424 $125 Implemented
MA0752 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,566 $37,930 Implemented
MA0752 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,599 $47,900 Implemented
IA0546 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,361 $6,263 Implemented
IA0546 # 02 Y:2015 02 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,907 $7,104 Implemented
IA0546 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,451 $5,839 Implemented
IA0546 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $463 Implemented
IA0546 # 05 Y:2015 05 2015 SHUT OFF PILOTS IN STANDBY EQUIPMENT $814 $60 Implemented
IA0546 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $419 $539 Implemented
IA0546 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $229 $371 Implemented
WV0509 # 03 Y:2015 03 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,021 $1,000 Implemented
WV0509 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,146 $3,449 Implemented
WV0509 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $2,835 $885 Implemented
WV0509 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,057 $4,884 Implemented
WV0509 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $599 $182 Implemented
WV0509 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $553 $634 Implemented
TT0153 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,651 $225 Implemented
TT0153 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,247 $3,000 Implemented
TT0153 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,849 $125 Implemented
TT0157 # 02 Y:2015 02 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $39,567 $0 Implemented
TT0157 # 03 Y:2015 03 2015 UPGRADE CONTROLS ON COMPRESSORS $32,298 $15,201 Implemented
TT0157 # 05 Y:2015 05 2015 UPGRADE CONTROLS ON COMPRESSORS $26,007 $26,000 Implemented
TT0157 # 06 Y:2015 06 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $29,361 $9,500 Implemented