Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsNAICS | 3324 | Boiler, Tank, and Shipping Container Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0752 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $37,599 | $47,900 | Implemented |
MA0752 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,566 | $37,930 | Implemented |
SU0383 # 01 Y:2015 | 01 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $288 | $0 | Implemented |
SU0383 # 08 Y:2015 | 08 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $104 | $256 | Implemented |
SU0383 # 07 Y:2015 | 07 | 2015 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $218 | $471 | Implemented |
SU0383 # 03 Y:2015 | 03 | 2015 | ELIMINATE/REDUCE AN OPERATION | $11,567 | $5,737 | Implemented |
MA0679 # 06 Y:2011 | 06 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,785 | $11,650 | Implemented |
MA0679 # 05 Y:2011 | 05 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,376 | $55,750 | Implemented |
MA0679 # 01 Y:2011 | 01 | 2011 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $70,691 | $20,000 | Implemented |
MA0679 # 02 Y:2011 | 02 | 2011 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $45,173 | $20,100 | Implemented |
MA0679 # 03 Y:2011 | 03 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,174 | $55,000 | Implemented |
MA0679 # 04 Y:2011 | 04 | 2011 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,015 | $30,000 | Implemented |
SU0255 # 01 Y:2007 | 01 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,744 | $0 | Implemented |
SU0255 # 02 Y:2007 | 02 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,004 | $0 | Implemented |
SU0255 # 03 Y:2007 | 03 | 2007 | PAY BILLS ON TIME TO AVOID LATE FEES | $765 | $0 | Implemented |
SU0255 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,293 | $1,300 | Implemented |
SU0230 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,958 | $0 | Implemented |
SU0230 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,657 | $1,484 | Implemented |
SU0230 # 03 Y:2006 | 03 | 2006 | USE SYNTHETIC LUBRICANT | $6,237 | $0 | Implemented |
SU0230 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,565 | $0 | Implemented |
SU0230 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,565 | $1,608 | Implemented |
SU0230 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $72,359 | $27,000 | Implemented |
SU0230 # 01 Y:2006 | 01 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,527 | $0 | Implemented |