IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
NAICS 3324 Boiler, Tank, and Shipping Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0798 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,410 $1,570 Implemented
AM0798 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,120 $11,560 Implemented
AM0798 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $66,000 $20,000 Implemented
AM0798 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $126,730 $229,415 Implemented
AM0798 # 01 Y:2020 01 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $336,600 $0 Implemented
AM0669 # 04 Y:2014 04 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,332 $3,600 Implemented
AM0669 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,407 $52 Implemented
AM0669 # 08 Y:2014 08 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $950 $44 Implemented
AM0669 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,410 $0 Implemented
AM0669 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,186 $570 Implemented
AM0669 # 02 Y:2014 02 2014 METER WASTE WATER $20,590 $4,500 Implemented
AM0669 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,663 $12,000 Implemented
OK0874 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,847 $980 Implemented
OK0874 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,682 $0 Implemented
OK0874 # 02 Y:2014 02 2014 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,364 $1,568 Implemented
OK0874 # 06 Y:2014 06 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $934 $1,024 Implemented
OK0874 # 01 Y:2014 01 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $380 $112 Implemented
AM0649 # 01 Y:2014 01 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $112,575 $24,000 Implemented
AM0649 # 05 Y:2014 05 2014 USE SYNTHETIC LUBRICANT $3,690 $0 Implemented
AM0649 # 08 Y:2014 08 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $650 $0 Implemented
AM0649 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $250 $55 Implemented
AM0649 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $235 $30 Implemented
OK0860 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,722 $1,750 Implemented
OK0860 # 12 Y:2013 12 2013 INSTALL OCCUPANCY SENSORS $445 $3,675 Implemented
AM0603 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,180 $3,110 Implemented