IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
NAICS 3324 Boiler, Tank, and Shipping Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0669 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,663 $12,000 Implemented
AM0669 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,407 $52 Implemented
AM0669 # 02 Y:2014 02 2014 METER WASTE WATER $20,590 $4,500 Implemented
AM0669 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,410 $0 Implemented
AM0669 # 04 Y:2014 04 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,332 $3,600 Implemented
AM0669 # 06 Y:2014 06 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,800 $315 Not Implemented
AM0669 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,186 $570 Implemented
AM0669 # 08 Y:2014 08 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $950 $44 Implemented
IA0526 # 04 Y:2014 04 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,757 $460 Not Implemented
IA0526 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,290 $27,423 Not Implemented
IA0526 # 02 Y:2014 02 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,840 $1,090 Not Implemented
IA0526 # 01 Y:2014 01 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,860 $845 Not Implemented
IA0526 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $571 $1,430 Not Implemented
IA0526 # 06 Y:2014 06 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $847 $4,000 Not Implemented
IA0525 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $3,951 $100 Implemented
IA0525 # 02 Y:2014 02 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $24,087 $20,750 Not Implemented
IA0525 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,330 $730 Implemented
IA0525 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $846 $1,491 Not Implemented
IA0525 # 03 Y:2014 03 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,354 $105 Implemented
IA0525 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $584 $687 Implemented
NC0514 # 09 Y:2014 09 2014 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,213 $1,017 Not Implemented
NC0514 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $3,435 $868 Implemented
NC0514 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,983 $100 Implemented
NC0514 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,436 $50 Implemented
NC0514 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,388 $5,250 Not Implemented