IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
Reset
NAICS 332410 Power Boiler and Heat Exchanger Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2316 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,726 $4,515 Implemented
LS2316 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,894 $135 Implemented
LS2316 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $460 $753 Implemented
LS2316 # 01 Y:2023 01 2023 INSTALL TIMERS AND/OR THERMOSTATS $3,030 $30 Not Implemented
LS2316 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,296 $25,200 Not Implemented
LS2316 # 04 Y:2023 04 2023 USE PHOTOCELL CONTROLS $1,069 $370 Not Implemented
TT0300 # 09 Y:2023 09 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,809 $156 n/a
TT0300 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $18,281 $13,000 n/a
TT0300 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,078 $18,500 n/a
TT0300 # 11 Y:2023 11 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,868 $1,965 n/a
TT0300 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,614 $19,910 n/a
TT0300 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,049 $13,500 n/a
TT0300 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,075 $30,000 n/a
TT0300 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $46,047 $221,715 n/a
TT0300 # 10 Y:2023 10 2023 UPGRADE CONTROLS ON COMPRESSORS $8,509 $17,500 n/a
TT0300 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $22,385 $37,500 n/a
TT0300 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $41,095 $32,000 n/a
OK1062 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,554 $0 Implemented
OK1062 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,294 $2,732 Implemented
OK1062 # 03 Y:2022 03 2022 USE RADIANT HEATER FOR SPOT HEATING $12,930 $48,590 Not Implemented
OK1062 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,957 $30,186 Implemented
OK1062 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $101 $580 Implemented
NL0033 # 01 Y:2019 01 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $39,609 $71,240 Implemented
NL0033 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,635 $42,417 Not Implemented
NL0033 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $919 $1,000 Implemented