IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

205

matching recommendations
Reset
NAICS 33242 Metal Tank (Heavy Gauge) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0295 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $4,700 $3,360 Implemented
MZ0295 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,599 $34,694 Implemented
MZ0295 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,658 $3,500 Implemented
MZ0295 # 07 Y:2020 07 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,773 $1,390 Not Implemented
MZ0295 # 08 Y:2020 08 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,561 $360 Implemented
MZ0295 # 09 Y:2020 09 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $675 $322 Implemented
MZ0295 # 10 Y:2020 10 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,456 $9,000 Not Implemented
LE0489 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,609 $10,500 Not Implemented
LE0489 # 08 Y:2020 08 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,899 $7,200 Not Implemented
LE0489 # 07 Y:2020 07 2020 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $9,314 $30,000 Implemented
LE0489 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,668 $21,820 Implemented
LE0489 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $5,400 $12,000 Implemented
LE0489 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,208 $8,000 Not Implemented
LE0489 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,293 $12,000 Not Implemented
LE0489 # 01 Y:2020 01 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $3,081 $48 Not Implemented
MZ0256 # 06 Y:2018 06 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,110 $3,000 Not Implemented
MZ0256 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,331 $1,160 Not Implemented
MZ0256 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,876 $0 Not Implemented
MZ0256 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,589 $0 Implemented
MZ0256 # 04 Y:2018 04 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $799 $10,685 Not Implemented
MZ0256 # 05 Y:2018 05 2018 USE COMPRESSOR AIR FILTERS $3,317 $7,200 Implemented
MZ0256 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $4,834 $26,380 Not Implemented
MZ0256 # 08 Y:2018 08 2018 USE SOLAR HEAT TO HEAT WATER $6,041 $66,682 Not Implemented
UA0180 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $327 $735 Implemented
UA0180 # 06 Y:2017 06 2017 PAY BILLS ON TIME TO AVOID LATE FEES $296 $0 Implemented