IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

323

matching recommendations
Reset
NAICS 33243 Metal Can, Box, and Other Metal Container (Light Gauge) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0141 # 06 Y:2015 06 2015 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $12,857 $0 Implemented
DL0141 # 07 Y:2015 07 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,770 $0 Implemented
DL0141 # 09 Y:2015 09 2015 INSTALL TIMERS AND/OR THERMOSTATS $860 $0 Implemented
AM0669 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,407 $52 Implemented
AM0669 # 02 Y:2014 02 2014 METER WASTE WATER $20,590 $4,500 Implemented
AM0669 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,410 $0 Implemented
AM0669 # 04 Y:2014 04 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,332 $3,600 Implemented
AM0669 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,663 $12,000 Implemented
AM0669 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,186 $570 Implemented
AM0669 # 08 Y:2014 08 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $950 $44 Implemented
IA0525 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,330 $730 Implemented
IA0525 # 03 Y:2014 03 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,354 $105 Implemented
IA0525 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $584 $687 Implemented
IA0525 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $3,951 $100 Implemented
WV0480 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,022 $11,662 Implemented
WV0480 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,543 $3,291 Implemented
WV0480 # 06 Y:2014 06 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,967 $1,000 Implemented
WV0480 # 10 Y:2014 10 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,088 $500 Implemented
WV0480 # 11 Y:2014 11 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $934 $1,078 Implemented
WV0480 # 12 Y:2014 12 2014 DEVELOP A REPAIR/REPLACE POLICY $783 $396 Implemented
AM0649 # 01 Y:2014 01 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $112,575 $24,000 Implemented
AM0649 # 05 Y:2014 05 2014 USE SYNTHETIC LUBRICANT $3,690 $0 Implemented
AM0649 # 08 Y:2014 08 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $650 $0 Implemented
AM0649 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $250 $55 Implemented
AM0649 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $235 $30 Implemented